PD Hook

P.D. Hook (Hatcheries) Ltd

Challenge: To design and manufacture stainless steel gratings which both accept trolley loadings and have a smooth surface to allow trollies full of un-hatched eggs to cross the drainage system.

View Case Study

Concord College

Challenge: To design, manufacture and supply curved external drainage to meet the architects vision for Concord College.

View Case Study

University of Birmingham Stainless Steel Shower Drainage

University of Birmingham

Challenge: To design, manufacture and supply the stainless steel floor drainage solution capable of withstanding the high traffic for the University of Birmingham's sports facility.

View Case Study

Grosvenor House Hotel

Challenge: To design, manufacture and supply a durable, high performance floor drainage solution capable of withstanding the large amount of traffic from this busy hotel.

View Case Study

Fareham Leisure Centre

Challenge: To design, manufacture and supply an effective, bare food friendly drainage solution to Fareham Leisure Centre.

View Case Study

HSBC, 8 Canada Square

Challenge: To design, manufacture and supply a sustainable, effective drainage solution in a short lead time.

View Case Study

London Bridge Place

Challenge: To design, manufacture and supply a drainage solution capable of withstanding a high volume of pedestrian traffic whilst being as discrete as possible.

View Case Study

ALPHA LSG

Alpha LSG

Challenge: To design, manufacture and supply a drainage solution keeping in mind the positioning of installed kitchen appliances, and their hydraulic requirements.

View Case Study

Gatwick Monorail

Challenge: To design, manufacture and supply a heavy duty drainage solution capable of meeting all loading and hydraulic requirements.

View Case Study

Higgidy

Challenge: To design, manufacture and supply a drainage solution that met all hydraulic, legal and time requirements.

View Case Study

Five Pancras Square

Challenge: To design, manufacture and supply a sustainable, effective drainage channel to this state of the art leisure centre.

View Case Study

No. 1 Poultry

Challenge: To design, manufacture and supply a discrete drainage solution for this iconic London building's roof terrace.

View Case Study

Clapham Leisure Centre

Challenge: To design, manufacture and supply a sustainable, effective drainage solution to this new build leisure centre.

View Case Study

All England Lawn Tennis & Croquet Club

Challenge: To design, manufacture and supply a specialist drainage solution for this high profile tennis club.

View Case Study

Hengrove Park Leisure Centre

Challenge: To design, manufacture and supply the optimum floor drainage solution for Hengrove leisure centre.

View Case Study

Sunningdale Golf Club

Component Developments was approached to design, manufacture and supply a hygienic stainless steel bratt pan gully capable of taking a high volume of water.

View Case Study

Solent Butchers

Challenge: To design, manufacture and supply a high capacity stainless steel floor drainage solution for the leading meat industry specialist.

View Case Study

Gymbox

Challenge: To design, manufacture and supply a high performance, durable stainless steel floor drainage solution for these up and coming gyms.

View Case Study

The Mandarin Oriental

Challenge: To design, manufacture and supply stainless steel drainage solutions in the kitchen and leisure areas of this prestigious London hotel.

View Case Study

Centre Point

Challenge: To design, manufacture and supply stainless steel floor drainage systems for a huge part of London's history.

View Case Study

Sushi Samba

Challenge: To design, manufacture and supply a stainless steel floor drainage solution that could effectively meet all requirements within a depth restriction.

View Case Study

BBC Broadcasting House

Challenge: To design, manufacture and supply a sustainable, durable stainless steel floor drainage solution for BBC.

View Case Study

Bank of England

Challenge: To design, manufacture and supply a bespoke stainless steel drainage channel to go under a wall in the male changing shower area.

View Case Study

York House Foods

Challenge: To design, manufacture and supply a hygienic, sustainable surface protection and floor drainage solution in a way to prevent factory shut down.

View Case Study

BP, Sunbury

Challenge: To manufacture a drainage channel that fits with the modern aesthetic whilst effectively managing water run off.

View Case Study

Kerry Foods Ltd

Challenge: To design, manufacture and supply stainless steel floor and surface protection solutions to food production areas, where hygiene is paramount.

View Case Study

Rathfinny Channel 2

Rathfinny Winery

Challenge: To design, manufacture and supply a sustainable, high performance drainage solution.

View Case Study

Oris Ltd

Challenge: to design, manufacture and supply a drainage solution that meets all hygiene and hydraulic requirements.

View Case Study

Brick Brewery

Challenge: To design, manufacture and supply a floor drainage solution capable of meeting the large volume of water run off from a microbrewery.

View Case Study

Pfizer Pharmaceuticals

Challenge: To design, manufacture and supply a drainage solution keeping in-line with the requirements of a pharmaceutical research plant.

View Case Study

The University of Sheffield

Challenge: To design, manufacture and supply 16 bespoke stainless steel gullies to be installed into the canteen kitchen

View Case Study

Dominos Pizza Group

Challenge: To design, manufacture and supply the optimum drainage solution for this large scale pizza retailer.

View Case Study

Leigh Sports Village

Challenge: To design, manufacture and supply a drainage solution to manage water-run off from changing and shower areas.

View Case Study

Naturediet Pet Food

Challenge: To design, manufacture and supply a sustainable, effective drainage system to replace the existing, under-performing system.

View Case Study

Tilmanstone Salads

Challenge: to design, manufacture and supply a drainage solution that meets all hygiene and hydraulic requirements.

View Case Study

New Beacon School

Challenge: To provide a sustainable, effective stainless steel drainage solution suitable for vinyl sheet flooring.

View Case Study

Four Pure

Challenge: To design a high performance drainage solution capable of coping with the hydraulic requirements of a Brewery.

View Case Study

Battersea Reach, Symmetrical Slot Drainage System

Battersea Reach

Challenge: To provide a visually subtle, effective and sustainable slot drainage system. Which met all hydraulic, aesthetic and loading requirements.

View Case Study

External Channels at Green Park Tube Station

Green Park Tube Station

Challenge: To design, manufacture and supply a sustainable, durable drainage solution for Green Park Tube Station.

View Case Study

Samuel Smith's Brewery

Challenge: To create a drainage system which would meet all hygiene, health and safety and hydraulic requirements of the Brewery.

View Case Study

The Portway Lifestyle Centre

The Portway Lifestyle Centre

Challenge: To provide a cost-effective, sustainable drainage solution to manage water run off from changing and shower areas.

View Case Study

Fruitanize

Challenge: To provide a sustainable, hygienic drainage solution which meets all FDA, loading and hydraulic specification.

View Case Study

Za Za Bazaar

Challenge: To provide a stainless steel drainage solution whilst working within strict building and time limitations.

View Case Study

The Francis Crick Institute

Challenge: To work alongside C&C Catering to provide a sustainable, hygienic drainage solution to meet the projects varying hydraulic requirements.

View Case Study

Tate Modern

Challenge: To provide a sustainable, effective drainage solution. Taking into account the underground pipework, kitchen plan and FDA requirements.

View Case Study

BHJ Protein Foods Ltd

Challenge: To provide a sustainable, effective drainage solution resistant to the chemicals used by BHJ Protein Foods.

View Case Study

University College London Hospital

Challenge: To design a sustainable, hygienic drainage solution that meets all safety, loading and hydraulic requirements.

View Case Study

Anspach and Hobday Brewery.

Challenge: Provide a high performance drainage channel, that could withstand heavy loadings and large amount of effluent.

View Case Study

Fitness First

Challenge: To work alongside Fitness First's in-house engineering department to design the optimum drainage solution.

View Case Study

McCains Image

McCain Foods Limited

Challenge: To provide sustainable high performance drainage solution that could withstand heavy loadings and varying hydraulic requirements.

View Case Study

Cheesegrater

The Leadenhall Building

Challenge: To design and supply a drainage solution, suitable for vinyl sheet flooring. Whilst meeting all loading, design and flow-rate requirements.

View Case Study

1Rebel

Challenge: To provide a sustainable, effective drainage solution to manage to water run off from shower areas, whilst keeping in line with the industrial design theme.

View Case Study

Cafe Royal

Challenge: To offer advice and guidance to specifiers and on-site contractors, whilst supplying the best possible drainage solution.

View Case Study

Facebook

Challenge: To design and manufacture a drainage solution, taking into account existing pipework, architectural designs and the necessary hydraulic requirements.

View Case Study

2 Sisters Food Group

Challenge: To replace existing, inadequate drainage systems with a more effective, sustainable solution.

View Case Study

Aldgate Tower CD 2

Aldgate Tower

Challenge: To design and manufacture facade drainage channels, which fit with the architectural vision and meet all hydraulic and safety requirements.

View Case Study

Thank you to the Sheraton Grand Hotel & Spa for allowing us to use their image on our header.

Sheraton Grand Hotel

Challenge: To provide the ideal drainage solution, that could cope with large hydraulic requirements whilst keeping hygiene paramount.

View Case Study

Albion Riverside

Challenge: To work alongside architects to provide a subtle, yet effective external drainage solution.

View Case Study

Park Chinois

Challenge: To provide a sustainable, hygienic drainage solution which meets all FDA, hydraulic and design requirements.

View Case Study

H.M.P Hull

Challenge: To provide a drainage solution suitable for the prison environment, meeting all necessary legal and hydraulic requirements.

View Case Study

Greencroft Bottling Company

Challenge: To provide a complex channel system, capable of sustaining the large hydraulic requirements needed for this large scale factory.

View Case Study

Ropemaker Building

Ropemaker Place

Challenge: To design and manufacture a series of complex stainless steel planters, to match the architects vision.

View Case Study

Sainsbury's

Sainsbury's

Challenge: To design a standard range of drainage products to be used in Sainsbury's across the UK.

View Case Study

The Ashburton Learning Village

Challenge: To provide a drainage solution to manage water run-off from shower areas, within a one week lead time.

View Case Study

Stokesley Leisure Centre

Challenge: To provide a drainage solution in a short lead time for a leisure centre refurbishment.

View Case Study

Tryton Foods

Challenge: To work in partnership with the associated trades, to provide the optimum drainage solution. Keeping in-line with FDA, specification and hydraulic requirements.

View Case Study

More London

Challenge: To provide a drainage solution to this large-scale project, in a short lead time.

View Case Study