- Carefully unload the assembled cover and remove packaging material.
- Fit the profiled outer frame over the manhole and adjust to finished
screed level.
- Fix and bed-in the profiled outer frame.
- Draw the flooring over the angled portion of the profiled frame (as
detailed below) and hold in position by dropping in the smaller clamping
frame.
|
 |
- Bolt the two frames together, clamping the flooring between the two.
- Assemble the lid by covering the backing plate with flooring material
and clamping at the edges with the stainless steel trim.
- The completed lid is now screwed down in position with the countersunk
hexagonal socket head screws, (unless alternative fixings are specified).
- Ensure Vinoseal covers are adequately protected against possible
damage resulting from the continuation of work in the area.
Immediately before handover of the building remove the protective peel-off
strips from the trim.
|