INSTALLATION GUIDE
  1. Ensure that the drain pipe to be connected to the gully is the correct depth below floor level.

  2. Gullies push fit to PVC, 110mm, 160mm diameter sockets, use the appropriate adaptor for clay or cast iron pipework.

  3. Check gully is both level and plumb.

  4. If a Damp Proof Membrane (DPM) is being used, press onto gully and secure with the DPM clamping flange.

  5. Place the “O”-ring seal over the spigot of the grating seating (omit if DPM flange used).

  6. Insert spigot into the gully, ensuring “O”-ring has sealed.

  7. Using the levelling bolts, adjust to finished floor level and bed in position.

  8. Check level, height and position prior to backfilling.

  9. Ensure the following are fitted prior to cleaning with soapy water; grating, basket, odour trap, rodding port and gasket.

  10. Ensure the gully is adequately protected from possible damage resulting from the continuation of building work in the area.
    For height adjustable side outlet gullies, the spigot to the grating seating may require site cutting to allow the spigot to seat over the trap.





Typical Vertical Outlet Gulley
Typical Side Outlet Gulley

1. Type 5004 Profile, Tiles
2. Grating
3. Type 5013 Profile, Vinyl
4. Grating Seating
5. 'O' Ring Seal
6. Waste Basket

7. D.P.M Flange
8. Odour Trap
9. Rodding Port
10. Gully Pot
11. Gasket
12. Spigot